Time Lapse

I thought it would be cool to have one blog post feature the progression of the build.  I do not have a time lapse camera (and if I have that option on my I phone I don’t know how to use it) but I can take a photo from the same perspective and showcase them here.  So here goes!

ex17

Lake House summer of 2015

1bb5

Before the tear down – April 2016

4.19.16.1IMG_1450

April 6, 2016 – ready for demo

4.6.167

4.6.16 during demo

4.6.1612

4.6.16 Just 90 minutes later, demo is complete. She was a fun house!

4.13.16

4.13.16 using the old foundation for a big ass bonfire.

4.13.16.5

4.15.16

4.13.16 A little easier to envision the walkout basement.

4.19.16IMG_1450

4.19.16 Prepping for house foundation.

4.20.16

4.20.16 Footings poured!

4.24.16

4.24.16

4.24.16 ready to pour the walls

4.24.16 ready to pour the walls

lk4.27.16

4.26.16

Lk5.12.16.6

5/12/16 framing in the basement to prep for french door and windows.

5.21.16

May 21, basement is capped

5.21.16.2

May 21 – walk out basement

5.29.16

May 29 starting to build walls for 1st floor

5.29.16.2

MAy 29 – Future garage in front and house in back.

5.30.16

5.31.16 – loving the shed dormer windows on front side!

6.3.16

6.3.16  the rooms are framed on the 1st floor – still no garage foundation.

6.9.16.8

6.9.16 Garage foundation starting to take shape and trusses started on the house!

6.16.16

Dale was back filling the garage today! Can’t wait for him to put the yard back together – very hard for the crew and us to get around.

6.16.16.2

All the rooms on the 1st and 2nd floor are all laid out. Dan has spent a lot of time working with the crew. I am jealous but I have to work and go over at night.

6.22.16.6

6.19.16 Dan takes me out on Trixie for an evening ride and we snapped this photo.

6.22.16

6.22.16

6.22.16.5

6.22.16

6.22.16.4

6.22.16

6.22.16.2

6.22.16

lh6.30.16

6.28.16 Gargage start

lh6.30.16.7

6.30.16  Front porch taking shape

July 29

July 29 – garage slab poured and retaining wall being built

Aug 5 - trim is going up.

Aug 5 – trim is going up.

8.5.16.5

8.18.16house

8.17.16 The 2nd floor “bath tub” window has arrived and was installed. That means all windows on the house are in!

8.17.16

8.18.16 Septic in foreground (green thing)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s