New Carpets

 7.15.14  New carpets were installed in the 4 bedrooms.  But first, we had to remove everything!  Finding a place to fit it all was difficult.  I  wanted to have all 4 rooms painted so I wouldn’t have to paint after the carpet was installed.  I was able to get most of it painted but not all.  I was actually painting on the morning of install, hoping it would dry in time.

Our master bdrm before the carpet arrives - looks so large without furniture

Our master bdrm before the carpet arrives – looks so large without furniture

Upstairs room - the balcony beyond that slider was a great place to store stuff (til it rained)

Upstairs room – the balcony beyond that slider was a great place to store stuff (til it rained)

removing vanity

removing vanity

Dan removed the vanity before the carpet arrived but I didn't have time ot finish painting

Dan removed the vanity before the carpet arrived but I didn’t have time ot finish painting

Not loving the blue I painted on the walls but not enough time to repaint

Not loving the blue I painted on the walls but not enough time to repaint

Tanner's room is the only bedrrom that still has popcorn ceilings.  Will have to take care of that and walls after carpet is installed

Tanner’s room is the only bedrrom that still has popcorn ceilings. Will have to take care of that and walls after carpet is installed

Living room is full of displaced furniture

Living room is full of displaced furniture

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s